Confirmation Of Close Project: Fill & Download for Free

GET FORM

Download the form

How to Edit and draw up Confirmation Of Close Project Online

Read the following instructions to use CocoDoc to start editing and finalizing your Confirmation Of Close Project:

  • To get started, find the “Get Form” button and click on it.
  • Wait until Confirmation Of Close Project is ready.
  • Customize your document by using the toolbar on the top.
  • Download your finished form and share it as you needed.
Get Form

Download the form

The Easiest Editing Tool for Modifying Confirmation Of Close Project on Your Way

Open Your Confirmation Of Close Project Without Hassle

Get Form

Download the form

How to Edit Your PDF Confirmation Of Close Project Online

Editing your form online is quite effortless. No need to install any software on your computer or phone to use this feature. CocoDoc offers an easy software to edit your document directly through any web browser you use. The entire interface is well-organized.

Follow the step-by-step guide below to eidt your PDF files online:

  • Browse CocoDoc official website on your device where you have your file.
  • Seek the ‘Edit PDF Online’ icon and click on it.
  • Then you will open this free tool page. Just drag and drop the file, or choose the file through the ‘Choose File’ option.
  • Once the document is uploaded, you can edit it using the toolbar as you needed.
  • When the modification is completed, tap the ‘Download’ button to save the file.

How to Edit Confirmation Of Close Project on Windows

Windows is the most conventional operating system. However, Windows does not contain any default application that can directly edit form. In this case, you can install CocoDoc's desktop software for Windows, which can help you to work on documents quickly.

All you have to do is follow the steps below:

  • Install CocoDoc software from your Windows Store.
  • Open the software and then upload your PDF document.
  • You can also select the PDF file from Dropbox.
  • After that, edit the document as you needed by using the a wide range of tools on the top.
  • Once done, you can now save the finished PDF to your computer. You can also check more details about how to edit on PDF.

How to Edit Confirmation Of Close Project on Mac

macOS comes with a default feature - Preview, to open PDF files. Although Mac users can view PDF files and even mark text on it, it does not support editing. Through CocoDoc, you can edit your document on Mac easily.

Follow the effortless guidelines below to start editing:

  • First of All, install CocoDoc desktop app on your Mac computer.
  • Then, upload your PDF file through the app.
  • You can upload the form from any cloud storage, such as Dropbox, Google Drive, or OneDrive.
  • Edit, fill and sign your template by utilizing some online tools.
  • Lastly, download the form to save it on your device.

How to Edit PDF Confirmation Of Close Project on G Suite

G Suite is a conventional Google's suite of intelligent apps, which is designed to make your workforce more productive and increase collaboration with each other. Integrating CocoDoc's PDF editing tool with G Suite can help to accomplish work handily.

Here are the steps to do it:

  • Open Google WorkPlace Marketplace on your laptop.
  • Look for CocoDoc PDF Editor and get the add-on.
  • Upload the form that you want to edit and find CocoDoc PDF Editor by choosing "Open with" in Drive.
  • Edit and sign your template using the toolbar.
  • Save the finished PDF file on your device.

PDF Editor FAQ

Which is used to provide adequate strength to optical fibres to prevent them from collapsing during installation?

Review Of Fiber Optic TechnologyProject Preparation And GuidelinesUnderground Cable ConstructionUnderground Cable InstallationAerial Cable InstallationCompleting Outside Cable Plant InstallationUnderground Cable InstallationCable Pre-installation ProceduresThe following items are key considerations in preparation for installing the fiber optic cable when the construction is ready for cable placement. Optical fiber cable should be carefully inspected when received and stored safely onside during storage before installation. All cables should be tested to ensure the cable was not damaged in shipment. All personnel handling cables, on reels, drums or spools (all three names are often used) or during installation, should be properly trained.Installation GuidelinesFollow the cable manufacturer's recommendations as no one knows how to handle cable as well as the company which made it. Fiber optic cable is often custom-designed for the installation and the manufacturer may have specific instructions on its installation.Check the cable length to make sure the cable being pulled is long enough for the planned cable run. Try to complete the installation in one pull if possible. Prior to any installation, assess the route carefully to determine the methods of installation and obstacles likely to be encountered.Pre-installation Cable Inspection§ Always wear protective gloves and safety boots (with steel toe caps) when handling reels – fiber optic cable spools are heavy.§ Check that the cable specified by the order to the supplier has been delivered. This includes cable type, number and types of fiber, length of cable, etc.§ Inspect the cable reel for signs of excessive weathering and/or damage.§ Reels must be transported or stored with their battens intact.§ Do not accept delivery of an optical fiber cable if the reel is visibly damaged.§ The plastic foil wrap must remain in place until cable placement.§ When removing the plastic foil wrap on the cable, do not use sharp tools that could potentially damage the cable jacket.§ Ensure that the cable reel bolts are all tightened.§ Verify that nails, bolts or screws on the inside surface of reel flanges are counter-sunk to avoid damage to the cable during placement.§ When ready to unspool the cable, place the cable reel in line with the intended direction of deployment, in order to prevent the cable from rubbing against the reel flange.§ Cable ends must always be sealed – using pre-formed or heat shrinkable end caps. Tape for sealing cable ends is considered unsuitable.§ Should the reel be rolled for some reason, always do so following the direction of the arrow.§ Reels on site, must be chocked to prevent them from moving or rolling.Testing Fiber Optic Cable On The ReelAll optical fiber cables must be tested while on the reel, prior to deployment. Installing cable is a time-consuming and expensive process so it is important to ensure the cable is good before installation. If there is any sign of damage to the reel of fiber, all fibers may need to be tested. If the cable and reel look undamaged, a sampling of one fiber per buffer tube or ribbon may be adequate.Pre-test the cable with a Visual Fault Locator (VFL) and/or an Optical Time-Domain Reflectometer (OTDR). The VFL will show if the fiber is continuous; the OTDR will confirm that the fiber still meets specifications and has no damage. A pigtail with a mechanical splice or a bare fiber adapter can be used to connect bare fibers to the VFL or OTDR.Testing shall be done on fibers in one direction at 1550nm, using a pulse width of 30ns since 1550nm is the wavelength that shows stress losses in the fiber best. OTDR traces must be stored and an electronic copy submitted to the project manager.Cable HandlingTwisting CableDo not twist the cable. Twisting the cable can stress the fibers. Tension on the cable and pulling ropes can cause twisting. Use a swivel pulling eye to connect the pull rope to the cable to prevent pulling tension causing twisting forces on the cable.Roll the cable off the spool instead of spinning it off the spool end to prevent putting a twist in the cable for every turn on the spool. When laying cable out for a long pull, use a "figure-8" on the ground to prevent twisting. The figure 8 puts a half twist in on one side of the 8 and takes it out on the other, preventing twists.Cable pay-off - over the top or from the bottom?For most installers, over the top makes more sense. However, advocates of “from the bottom” when jetting / blowing cable do exist. Ultimately, faced with this choice, a contractor must determine which option is favored by the client.Installing Swivel Pulling Eyes:Cable manufacturers install special strength members, usually aramid yarn (Dupont Kevlar), for pulling. Fiber optic cable should only be pulled by these strength members unless the cable design allows pulling by the jacket. Any other method may put stress on the fibers and harm them. Swivel pulling eyes should be used to attach the pulling rope or tape to the cable to prevent cable twisting during the pull.§ Strip the cable jacket and cut back all fibers to the end of the jacket, leaving the aramid strength members only.§ Separate the aramid yarn into two bundles and loop it through the swivel eve in opposite directions.§ Tie knots in each bunch at the eye and loop the strength members back to the cable jacket.§ Tape the strength members along the jacket and up to the pulling eye.Cables should not be pulled by the jacket unless it is specifically approved by the cable manufacturers and an approved cable grip, often called a “Kellems Grip,” is used. These grips are usually tied to the strength members also.Pulling RopeAn 8mm polyester or polyaramid pull rope must to be used for optical fiber cables that are to be pulled in by hand. When using a hauling winch, a 12,5mm or thicker polyester or polyaramid rope should be used as hauling rope.Ropes manufactured from nylon are not suitable as their stretch factor is too high and they can potentially cut into ducts. Steel hauling rope or galvanised wire must never be used as they can damage ducts and/or cables.Duct Fill Ratios for haulingFill ratios are calculated by comparing the area of an inner diameter cross-section of the inner-duct to the outer diameter cross-section area of the fiber optic cable. For optimum hauling performance, it is recommended that the cable-to-duct diameter fill ratio does not exceed 65%, or as per cable spec sheet.How To "Figure 8" Cable for Intermediate Pulls in OSP InstallationsOn very long OSP runs, typically longer than approximately 2.5 miles or 4 kilometers, it may be necessary to use an automated fiber puller at intermediate point(s) for a continuous pull or pull from the middle out to both ends (midspan pull.) When laying loops of fiber on a surface during a pull, use “figure-8” loops to prevent twisting the cable. The figure 8 puts a half twist in on one side of the 8 and takes it out on the other, preventing twists.Bend RadiusDo not exceed the cable bend radius. Fiber optic cable can be broken when kinked or bent too tightly, especially during pulling. If no specific recommendations are available from the cable manufacturer, the cable should not be pulled over a bend radius smaller than twenty (20) times the cable diameter.After completion of the pull, the cable should not have any bend radius smaller than ten (10) times the cable diameter.Pulling TensionExcess pulling tension on a fiber optic cable can damage the fibers. Tension limits assume the fiber is being pulled properly using the cable strength members. Fiber optic cable should only be pulled by the cable strength members unless the cable design allows pulling by a grip on the jacket. An approved cable grip, often called a “Kellems Grip,” must be used. These grips are usually tied to the strength members also. Any other method may put stress on the fibers and harm them.Do not exceed the maximum pulling tension rating. Consult the cable manufacturer and suppliers of conduit, innerduct, and cable lubricants for guidelines on tension ratings and lubricant use.When pulling long lengths of cable in conduit or innerduct (up to approximately 3 miles or 5 kilometers in the outside plant, use proper cable lubricants but make certain the lubricant is compatible with the cable jacket.If possible, use an automated puller with tension control and/or a breakaway pulling eye. On very long OSP runs (farther than approximately 2.5 miles or 4 kilometers), midspan pulls are necessary. Pull from the middle out to both ends or use an automated fiber puller at intermediate point(s) for a continuous pull.When laying loops of fiber on a surface during a pull, use “figure-8” loops to prevent twisting the cable.Cable PullingCables may be installed in ducts by pulling or blown in with special equipment. In this section we will cover both techniques, starting with cable pulling.Pre-Installation CheckPrior to any hauling, the following must be confirmed:· Maximum allowable pulling tension for the cable being installed· Minimum allowable bending radius during installation for the cable· Minimum allowable bending radius after installation for the cable· Cable length required for each pull· Cable length required at the splicing locationsDuct RoddingRodding is used to clear the duct passage and install the pulling rope, using fiberglass pushrods. An alternative is to use air-blowing device.· Push the rod into the duct until the front end of the rod reaches the adjacent HH / MH.· Attach the pulling rope to the end of the rod at the adjacent HH / MH.· Next, pull the rod and pulling rope back through the ductIf the air pressure method is preferred, the pulling rope will be blown through the duct until it reaches the adjacent HH / MH.Duct Testing and CleaningTo clean the duct, attach a cylindrical brush or close-fitting mandrel and a second rope to one end of the installed pull rope and pull this through the duct.If the cable sample or mandrel cannot pass through the duct, consult with the Client on whether to switch to an alternative duct or to repair the designated duct.Midspan Pulls and Center PullsPulling long cable runs may be difficult or impossible due to the friction between the cable and the duct. Lubrication helps but often does not completely resolve this issue. Guides are available from lubricant manufacturers to estimate the lengths possible to pull with proper lubrication. To assist with alleviating this issue, specialized techniques, such as center pulls or midspan-pulls can be used with either the manual pull or winch methods.Midspan PullsMidspan pulls are used to provide a series of shorter, lower-tension pulls in one direction. In a midspan pull, the cable is pulled through duct to a handhole or manhole and the pull is continued until sufficient cable has been pulled for the rest of the length of the pull. Cable that is pulled is laid in a “figure 8” pattern on the groundCenter PullsIn a center pull, the cable is placed in the middle of the pull and pulled off the spool in one direction until the end of the pull is reached. Then the cable is continued to be rolled off the reel into figured 8s on the ground. Then the figured 8 cable is flipped over and the end is pulled in the other direction. Ensure the cable is long enough for the entire pull before beginning the operation.Communication, directed by a team leader with team members positioned at each HH / MH is essential, for that the pulling action to be achieved in a synchronized manner. Communication via the use of either cell phones or two-way radio is desirable.· In a center pull operation, set up the cable reel near the center of the duct run to be pulled.· To avoid cable rubbing against drum flanges keep the drum level - orientate the drum so that natural payoff direction is towards the pulling direction. Always use cable jacks or a cable trailer to lift the drum during the hauling process.· Align the cable drum so that the cable can be routed from the top of the reel into the duct in as straight a path as possible.· Make use of a flexible cable guide – placed between the HH / MH lid and duct to be used.· Ensure that there is a swivel between the cable sock and the hauling rope.· Pull the cable in one direction to the intended HH / MH.· Uncoil the remaining cable in a figure-eight configuration.· Flip-over the figure-eight so that the pulling-eye end of the cable is on top. As mentioned previously, this can be accomplished by 3-installers, one at each end of the eight, and one at the center.· Pull the exposed end of the cable in the opposite direction to complete the pull. Hand-feeding of the cable paying off from the figure-eight is required.· A warning marker (colored tape or similar material) may be attached to the pull-line at ± 10m in front of the pulling grip to alert observers at HHs / MHs that the cable is approaching.· Place an end cap on all bare cable ends in HHs / MHs, to prevent moisture and/or dirt intrusion.Pulling TensionThe maximum allowable pulling tension on fiber cable can vary and is dependent on the cable construction. The maximum tension for a particular cable can be found on the cable spec sheet.Except for short runs or hand-pulls, tension must be monitored on the pull rope. The use of a breakaway swivel can be used to ensure that the maximum tension of the cable is not exceeded and should be used as a fail-safe rather than a primary means of monitoring tension.Cable lubricant is recommended for most fiber optic cable pulls as a means of lowering pulling tension.Pulling a new fiber optic cable over an existing one is never recommended due to the possibility of entanglement. Techniques exist to pull into ducts new ducts, especially the thin fiber ducts, that can allow safely adding cables to current conduits.Access Build (Drops)The final connection to a building, often called the drop, is unique. Drops are often fraught with deployment challenges including multiple tight bends and space constraints. The last phase of an installation is normally the most expensive and time consuming part of any overall fiber project. Careful planning and installation can mitigate the problems.Introduction to Air-Assisted InstallationsJetting or blowing (also sometimes referred to as floating) are two air-assisted cableinstallation techniques. Blowing cables does not really blow the cables in the duct, but consists of pushing the cable with a tractor mechanism while blowing compressed air into a preinstalled duct to float the cable in the duct and reduce friction. The air flow to helps “float” the cable inside the duct and reduces friction between the cable and the duct, making it possible to push the cable considerable distances in a duct. This technique provides an efficient, stress-free deployment in far greater distances than possible when pulling cable. Air-blown cable can be use in premises cabling installations as well as OSP.Jetting and blowing differ in how pulling force is applied to the cable. Jetting uses a missile at the front end of the cable. A differential pressure across the missile head creates a pulling force on the cable. Blowing does not use a missile - instead, the pulling force on the cable is due to fluid drag of air rushing along the cable - this pulling force is distributed along the cable length. A mechanical pushing device is common in both methods.It is common wisdom that hydraulics can give you higher forces than pneumatics. Mindful of this, a blowing machine with a pneumatic drive is recommended for cables up to 15mm in diameter and a blowing machine with a hydraulic drive is recommended for cables with a diameter in the range from 14 - 32mm.The key parameters when installing fiber cable in ducts are blowing distance and time. 1000 to 2000m is a typical blowing length. Typical installation speeds are 40-50 meters per minute under an air pressure of 10 bars (atmospheres). Most routes can be blown with a 10 bar supply.Smaller diameter and lower weight cables make possible larger blowing distances, so blowing cable is perfect for the new generation of microcables. The maximum cable push force will decrease as the duct inside diameter increases, reducing the achievable blowing distances.Blowing distance is directly related to the weight of cable, the pressure used and, friction from the inside of the microduct. Cable can be successfully blown further than 2-km when blowing heads are used in tandem.Additional air can also be inserted further down, to achieve more distance.Preparing For Blowing CableSurvey the complete route prior to blowing in order to determine the location of HHs / MHs and distances between then. Determine where coupling of ducts are necessary. Survey the route for the accessibility of terrain for the use of the intermediate (mid-point) fiber blowing equipment. Identify specified ducts to be utilised. And as always, consider the accessibility of HHs / MHs to the splicing vehicles.Jetting / Blowing the right cableChoosing the right cable is extremely important for any installation. Strictly speaking, the purpose of the cable is to protect the fibers during installation and the service lifetime. Cables share some but not all characteristics and you need to ensure you install the cable type appropriate for the application.Micro cables are designed with high-density polyethylene (HDPE) outer sheaths to minimize friction with the inner surface of micro ducts. They are also designed with the necessary stiffness properties to resist buckling forces and to negotiate changes in direction.The cable on the drum must be covered until just prior to installation to protect the jacket from heat due to exposure to the sun and getting dirty.Air-Assisted Installation PracticesConsider a very long link installation. Cable reels are typically supplied containing 4-km of cable. Mindful of this, reels are placed midway of a 4-km length. There’s plenty of evidence suggesting that the most efficient cable installation would involve two 2-km jetting shots (A to B followed by A to C). After jetting A to B, a ‘figure-8’ will be created at the midway point, to gain access to the end point of the cable previously on the drum. Next, the figure-8 end will be jetted in the other direction.One ought to be able to install 4-km of cable in one placement of the cable drum and blowing equipment consisting of; 2-km of cable jetting in opposite directions with 2-km of "figure-eighting" in the center. Adding more air blowing to a microduct further down can also increase the achievable distance. If at some point the cable movement slows down during the blowing process, then instead of taking a 2-km run, the jetting could be reduced to only 1-km. This would call for a second ‘figure-8’ to be made at the 1-km mark.Duct Integrity Testing (DIT)All team members MUST wear eye protection during DIT testing as small particles can be blown out of ducts through the holes in the DIT catcher.Air Test· Fit a DIT catcher on the far side and equip personnel with two-way radios.·Allow the air to flow through duct for at least one minute, to remove all loose particles and/or moisture.· Now proceed with the sponge test.Foam Sponge Test - cleaning the duct:· A sponge is typically 100mm in length and 2 x the duct ID.· Wet the sponge slightly with blowing lubricant.· Place the tight-fitting foam sponge inside the microduct.· At a pressure of 10bars, blow the sponge through the microduct.· If excess water or dirt exits the microduct, repeat the process.Mandrill TestOne can test ducts for bends, kinks or blockages that may hinder blowing cable by doing a mandrel test to see if one can blow a sample down the duct.· The sponge test MUST precede this test - a mandrill can damage a dirty duct.· Use a 40mm (1.6 inch) long mandrill made from Nylon or Teflon, or a 3m length of cable.· Use no more than 3-bar of pressure to blow-though the mandrill.· The mandrill OD, must be no more than 85% of the microduct ID.· At the receiving end, a DIT catcher must be used.· Note that a flying shuttle can cause injury and/or damage!· Always inspect the condition of the emerged mandrill, visible grooves is an indication of duct indents.Pressure TestA pressure test checks for coupler leaks or microduct punctures that could affect blowing cable.· Fit a high-pressure end-cap to the duct under test on the far-side.· Gradually build the pressure up to 10 bars (atmospheres.)· Test all coupling used for this test for leaks, using soap, water and a sponge.· Connect the air feed and leave this open until the pressure in duct stabilizes at 10 bars.· Close the air valve on the test assembly and monitor the pressure gauge for 5min.· Losing 1 bar in 5min is acceptable – any leak greater than that, must be found and fixed.If the duct fails DIT tests, consult with the relevant authority on whether to use an alternative duct or to repair of the designated duct.Micro Duct Fill RatioFor optimum jetting / blowing performance, ensure that your cable-to-duct diameter fill ratio does not exceed 76%. This is determined and provided by the microduct supplier. It is wise to always verify this by checking the provided spec sheet.Cable Blowing LubricantsAdding a small amount of lubricant to a tight-fitting foam carrier (sponge) before blowing it through the duct, will provide an open and lubricated pathway. It is argued to give better results compared to coating both the duct and cable with lubricant. Odd, huh? Let me try to explain. Lubricant on a cable jacket apparently makes it too "slippery" for optimal laminar-flow jetting.Let’s not forget that the air "pushes" on the jacket through friction. A too low friction jacket will not easily be pushed by air. Normally, as little as 0.25 litre of lubricant is required to coat 2km of cable.Suggested Air-Assisted Installation Practices· It is desirable to blow downhill wherever possible.· DIT results must be available prior to blowing the cable.· Always measure the cable diameter before jetting, to select the correct spacers for the blowing machine. The cable must lie snug in the V-groove between the drive rollers.· To ensure that the cable is not prone to slipping, push and pull the cable through the machine by hand a few times to ensure that the cable is seated properly in the drive rollers.· The cable must always enter the jetting machine under no tension and in a straight line.· The cable must be clean as it enters the blowing equipment to allow for effective gripping of the driving wheels. Contamination of the cable will cause unwanted friction and result in a reduced blowing distance.·· Monitor the speed and torque of the blowing machine as the cable is blown to ensure that the cable jacket is not damaged by the driving wheels.· One person must control the cable reel and be prepared for emergency stops.· Always note the meter reading on the cable and zero the blowing machine distance meter, prior to blowing.· Always establish two-way communication during the fiber deployment process at crucial points along the cable route.· The blowing machine should have an automatic shut-off feature that controls the push force applied to the cable. With this feature, cable and duct damage can be prevented should the cable stop abruptly within the micro duct.· Ensure that when connecting the transportation duct to the blowing machine, it is not entangled with the new or existing cable/s.· The ‘figure-8’ must be laid on a ground sheet and care must be taken to ensure that the cable does not touch the ground as it is fed into the machine.· To protect the end of the cable and also to guide the cable along its desired route, a bullet must be used.· As mentioned, blowing lubricant reduces the frictional drag on both cable and in the duct thus increasing the achievable distance.· To ensure that the blowing equipment remains in good working condition - after a week of continuous blowing - machine maintenance must be performed.Management of Cable SlackWhen handling cable, always wear; a protective overall, gloves and safety boots.Never exceed the recommended cable bend radius:· 10 x Cable OD - No Tension (installed)· 20 x Cable OD -Under Tension(being installed)· What is the minimum bend radius of your microducts?Formula: Radius min =10 x ODTherefore, if you have microduct has a OD of 10mm, your Radius min =100mm· A total length of 17m (15m for slack and 2m for splicing) of cable slack is traditionally required in a HH or MH housing a splice enclosure. Be sure to consider the accessibility of HHs / MHs to splicing vehicles as additional length of duct may be needed.· Install slack brackets on HH / MH walls to secure cables. The slack in the HH or MH needs to be tied together using a tie wrap or PVC tape at 1m intervals. The fiber cable slack inside the HH / MH must be coiled in a ‘clock-wise’ direction with minimal back tension.· Ensure that the slack of one splice closure does not become inter-twined with the slack of other splice closures in the HH / MH.· Bundle cables together in groups of relevance.· Do not route cables in such a manner that they block ducts.· Used ducts must be sealed between cable and duct.· Cable slack typically adds 2% to the overall distance. Thus a 100-km link is likely to contain as much as ± 102 Km’s of cable.Figure-8-ingThe preferred size of a figure-8 is about 5m in length, with each loop about 2.5m in diameter. To start with, set up two traffic cones 5m apart – then pay the cable off the top of the reel and loosely weave it around the cones in a figure-8 pattern - on top of a groundsheet. Large relaxed loops will help prevent the cable from becoming entangled.Continue to figure-8 the cable until the remainder of the reel is played off.In order to pull from the figure-8 - it is necessary to flip it over, a task that requires a minimum of three people -one at the centerand one at each end. The required cable end will now be at the top of the figure-8.Special Micro Duct Tools and AccessoriesAcceptable Cable Drum Jacks Must Be UsedToolsEnsure that installers are fully educated on the proper use and operation of any tool before starting a job.It is essential to always use the prescribed cutting tools to produce a clean and straight cut to a microduct, before inserting a coupler.BulletFixed to the end of the fiber cable before blowing starts, to guide the cable through the microduct.SpongeUsed for removing dirt and/or moisture from a microduct.ShuttleUsed to check the microduct for bends, kinks or blockages.Caps & PlugsUsed for the permanent or temporarily sealing of unused microducts to prevent water and dust from getting in.Use only the prescribed connectors and end-plugs.CouplersUsed for the air-tight coupling of microducts.De-bur ToolAllows for one to round-off a microduct after cutting - before adding a coupler, to produce an air-tight connectionLocking ToolUsed to firmly lock the microduct into a connector.Cable CarriersParachutes capture the air within a duct, tugging along with it the cable. In the absence of air pressure, they collapse allowing for easy pullback. An alternative is to use an Inflatable Carrier.

View Our Customer Reviews

Most competitive pricing for a small user of the major products for e-signing alone

Justin Miller