How to Edit The Unit 11 Optical Storage with ease Online
Start on editing, signing and sharing your Unit 11 Optical Storage online with the help of these easy steps:
- Click on the Get Form or Get Form Now button on the current page to jump to the PDF editor.
- Give it a little time before the Unit 11 Optical Storage is loaded
- Use the tools in the top toolbar to edit the file, and the edited content will be saved automatically
- Download your edited file.
The best-reviewed Tool to Edit and Sign the Unit 11 Optical Storage
A simple tutorial on editing Unit 11 Optical Storage Online
It has become very easy these days to edit your PDF files online, and CocoDoc is the best free app for you to make a series of changes to your file and save it. Follow our simple tutorial to start!
- Click the Get Form or Get Form Now button on the current page to start modifying your PDF
- Create or modify your content using the editing tools on the top toolbar.
- Affter changing your content, put on the date and draw a signature to finish it.
- Go over it agian your form before you click on the button to download it
How to add a signature on your Unit 11 Optical Storage
Though most people are accustomed to signing paper documents by writing, electronic signatures are becoming more accepted, follow these steps to PDF signature!
- Click the Get Form or Get Form Now button to begin editing on Unit 11 Optical Storage in CocoDoc PDF editor.
- Click on Sign in the tool menu on the top
- A popup will open, click Add new signature button and you'll have three ways—Type, Draw, and Upload. Once you're done, click the Save button.
- Drag, resize and position the signature inside your PDF file
How to add a textbox on your Unit 11 Optical Storage
If you have the need to add a text box on your PDF and create your special content, do some easy steps to carry it throuth.
- Open the PDF file in CocoDoc PDF editor.
- Click Text Box on the top toolbar and move your mouse to drag it wherever you want to put it.
- Write down the text you need to insert. After you’ve writed down the text, you can actively use the text editing tools to resize, color or bold the text.
- When you're done, click OK to save it. If you’re not satisfied with the text, click on the trash can icon to delete it and begin over.
A simple guide to Edit Your Unit 11 Optical Storage on G Suite
If you are finding a solution for PDF editing on G suite, CocoDoc PDF editor is a suggested tool that can be used directly from Google Drive to create or edit files.
- Find CocoDoc PDF editor and install the add-on for google drive.
- Right-click on a PDF file in your Google Drive and select Open With.
- Select CocoDoc PDF on the popup list to open your file with and allow CocoDoc to access your google account.
- Edit PDF documents, adding text, images, editing existing text, mark up in highlight, retouch on the text up in CocoDoc PDF editor and click the Download button.
PDF Editor FAQ
Did China build a 1,000 bed hospital for the coronavirus simply for show, an empty shell not designed for real use?
This is the preliminary design of the shelter hospital I have obtained.We can see that huoshenshan hospital is not a simple field hospital. It is not the kind that can be delivered by setting up a marching tent on flat land, setting operation area, nursing area, ward, accommodation area, canteen, sewage discharge, etc,Need to have fresh air system and negative pressure system to maintain a good air circulation system, with reliable air tightness (avoid cross infection)We need X-ray room, CT room, laboratory (serum), operating room, ICU room, all of which need large-scale instruments (can field hospitals have ICU?)The infrastructure such as reception room, oxygen station, morgue, incinerator, septic tank, medical channel, disinfection system, call system, suction system, oxygen pipeline system, sewage treatment system, life supply center, water and electrical network are requiredVideo conference system is needed to support consultation inside and outside the hospitalSingle and double ward is required to reduce cross infection. Each ward also needs to be equipped with life support system such as oxygen, ventilator, air conditioning, TV, toilet and bathNeed dormitory and canteen for medical staff, and have basic rest conditionsIf you want to build a hospital in 10 days and coordinate thousands of people, covering dozens of processes, going through the stages of design, disclosure, civil engineering, equipment installation, decoration, etc., this is different from the usual slow work and meticulous work, and multiple processes must be done in parallel.Day 1: drawing by four connections and one leveling Design Institute overnightFour connections and one leveling is the first step, that is, water, road, electricity, communication, and site leveling. On January 24, we saw hundreds of excavators excavating at the same time, which is the work of site leveling.In the process of ground leveling, CITIC Architectural Design Institute, which is responsible for the design work, is also starting work at the same time. In fact, CITIC design received an urgent design task on the afternoon of the 23rd. On that day, it organized a design team of 60 people and began to work out drawings overnight that night.After receiving the technical support request from Wuhan Urban Construction Bureau, the original design unit of Xiaotangshan Hospital, China Zhongyuan Design Institute, will send the original design drawings to the Urban Construction Bureau for standby within 1 hour, and provide technical support directly to CITIC Architectural Design Institute.Huoshenshan hospital is built according to the construction standard of infectious disease hospital, involving more than ten specialties, such as basic engineering, civil engineering and decoration engineering, water supply and drainage and fire fighting system, power supply and distribution system (excluding external lines), lighting and monitoring, ventilation and air conditioning system, communication weak current, medical gas engineering, purification engineering, outdoor and municipal supporting facilities, sewage treatment facilities, etc.For the design of each specialty, 4-5 people are needed in the way of bringing the old with the new. The interface between different specialties also needs to be divided. For example, the designer of communication weak current specialty needs to communicate with the designer of power supply and distribution and civil engineering, how to arrange my optical fiber and network cable, remember to pre dig the trench, reserve the PVC pipe, and the required power supply level during the civil engineering construction; the designer of medical gas engineering needs to To communicate construction methods and sealing requirements with Civil Engineering Decoration SpecialtyLet's think about it. There are 11 groups, each group has an interface, all of which need communication and docking. How much is the workload? Think about it. Moreover, the construction units are following the design drawings. If the design drawings are wrong, then rework will affect the construction period, and the whole country will watch.The construction period is 10 days in total. No mistakes are allowed. The construction unit is still waiting for the design unit's drawings to start, so it can only work while drawing. In order to start the civil engineering work as soon as possible, it is necessary to make the layout plan as soon as possible and determine the location of the basic engineering buildings such as wards, testing rooms, operating rooms and dormitories. After the layout plan is drawn up, relevant pipeline design shall be carried out, including the design of sewage pipeline, medical wastewater treatment, oxygen pipeline, water pipeline, cable pipeline, network pipeline, etc.; then process flow chart shall be drawn to guide the construction unit how to do and how to do the work.It took only 60 hours, two days and two nights, until the early morning of January 26, CITIC Architectural Design Institute completed all the designs.Day 2: sand backfill of two cloth and one membrane embedded pipeline1.25.The construction unit is jointly constructed by China Construction Third Engineering Bureau, Wuhan Construction Engineering Group, Wuhan Municipal Administration and Hanyang municipal administration. During the construction period, all construction units are working in two shifts, a day shift and a black shift. Everyone started the 997 work without complaint. Major general Zhang Yanling, President of Xiaotangshan field hospital, also came to Wuhan to guide the construction of huoshenshan hospital.The labor cost in this period is very high. One is that there are few workers during the new year, the other is that the workload of two shifts is too large, and the other is that Wuhan is the center of the epidemic area. In such a difficult situation, the engineering party has also organized a construction team of nearly 2000 people to build on demand.With the plan and process drawing, the construction company began to level the site, backfill the gravel, and cross the construction with the embedded pipeline. The construction of infectious disease hospital also needs to do anti-seepage work to prevent sewage from flowing into the ground and polluting the nearby Guanyin lake.There is an additional process: on the flat ground, 20 cm thick sand is laid, and the construction is interleaved with the pipeline embedment. Then, two layers of geotextile (600g / m2 polypropylene filament geotextile) and one layer of HDPE anti-seepage membrane (2.0mm double rough anti-seepage membrane) will be laid on it, so as to achieve anti-seepage.The white one is geotextile and the black one is impermeable membrane. The anti-seepage membrane is connected by hot-melt welding, so that the high-density polyethylene is fused together to achieve anti-seepage. This construction is very tedious. Let's see the process. Is it a big job?On the basis of anti-seepage, the waste water and rainwater can be further collected and discharged after three times of purification.Telecom, China Unicom and China Mobile all completed 5g base station of huoshenshan hospital on the first day of the new year, including optical cable laying, base station installation, commissioning and opening, all racing against the deathUnlike 5g base station, which is wireless transmission, on the first night of the first day of the first year, the State Grid Hubei Electric Power Wuhan power supply company has not yet got the overall plan of the project, so the comrades of the power supply bureau tried to complete the installation of four ring network cabinets and the relocation of another 10kV line to ensure the power supply, which are all special affairs. Because there is no plan of the project, it is likely to find a way to move the installed transformer, that is, rework.Maybe this is the "saturation rescue" in "wandering the earth", the Chinese rescue. Whether rework is not important, whether waste cost is not important, and whether power transmission as soon as possible does not affect the construction period is important.Regardless of cost, as long as the result.Day 3 basic engineering construction material purchase and allocationOn January 26, all design drawings were handed over in the early morning.As soon as Wuhan power supply company finished the work, it began to move the transformer, and began to install other transformers. It directly called out the commitment of "24-hour standby, where the construction site is, where the cable will be laid".At the same time, the construction company is also working in two shifts. People and machines are intermittently carrying out the construction of foundation works, pipeline embedding and anti-seepage membrane. Outside the site, the first ward has been built. At the same time, a large number of material procurement needs are gradually advancing, with high efficiency!The materials needed to build a hospital are much more complicated than those of masks, protective clothing, goggles, disinfectants, medicines and so on. For example, for power supply, transformer, ring cage and 8km power cable need to be purchased; for example, for communication network machine room, network switch, ups and storage server need to be purchased; for example, large air conditioning unit used for exhaust system; for example, pipes and valves of nodular cast iron; for example, color steel plate used for building board room.There are also medical equipment procurement, such as medical equipment, electronic medical equipment, diagnostic equipment, testing equipment, optical equipment, imaging equipment, scanning equipment, anesthesia breathing equipment, insertion diagnosis, etc;There are also information system construction, such as security system, Fas / BAS fire fighting system, medical imaging system, hospital management system, electronic medical record system, video conference, pharmacy automation management, etcBut it's not a problem in the face of a united heart and a United will.For example, Qilu pharmaceutical originally purchased 12 exhaust units (such large-scale equipment needs to be ordered and reproduced, few of which are ready-made). It is preparing to deliver goods from the manufacturer. Hearing the need of huoshenshan hospital, it immediately sent the equipment directly to Wuhan, which is used to isolate the exhaust system of negative pressure ward.For example, Ziguang and xinhuasan directly donated the network switch and other equipment needed by the hospital; for example, aerospace science and Technology aerospace cable company, after receiving the demand, urgently coordinated within three hours, loaded and delivered the flame-retardant cable overnight; for example, Xinxing International China, as required, delivered the ductile iron pipe and various pipe fittings to the construction site at 7:00 a.m. on the first day of the lunar new year; for example, China Minmetals, as required, within 24 hours For example, China Railway Construction Corporation directly demolished the active plank houses in use and sent them to the construction site in an emergency.Day 4: concrete pouring after foundation constructionJanuary 27th.There are four construction enterprises, i.e. China Construction Third Engineering Bureau, Wuhan Construction Engineering Group, Wuhan Municipal Engineering Group and Hanyang municipal engineering group. More than 500 professional management personnel, more than 1500 workers, more than 200 sets of mechanical equipment are on-site construction day and night, and 20 million cloud supervisors are always paying attention to the construction progress.The oney sauce (concrete mixer truck) and concrete pump truck we saw in the live broadcast are diligently mixing and pouring concrete. After the concrete pouring, it needs to wait for a period of time to harden before the box type ward can be hoisted on the concrete foundation.At the same time, the water supply and drainage discipline and civil engineering discipline are under construction, excavating pipeline trench, preparing for pipeline laying, backfilling and other processes.Day 5 concrete pouringJanuary 28th. The project is progressing smoothly, some concrete foundations have been hardened, the first module of the box type plank house has been hoisted, and the construction team has started to build a large area plank house. After the house is built, it is necessary to start to install water and electricity lines, carry out concealed engineering construction, and start to install various medical equipment.On this day, China Construction Third Engineering Bureau released the renderings of huoshenshan hospital, and we are about to witness the birth of a 1000 bed hospital from scratch.Day 6 build plank houseJanuary 29th. All went well. On the construction site, we continued to lay impermeable membrane, set up steel framework, poured concrete, and started to build container plank houses.Day 7 sand and stone backfillingJanuary 30th. The site leveling, sand backfilling and HDPE film laying have been completed, and overtime work is in progress for the mobilization, modification and site hoisting of the container plank house.At this time, the weak current engineering construction in the building area is carried out synchronously, such as the installation of wires, telephone lines, Gigabit network lines, network machine rooms, jumper racks, and related equipment; the water supply and drainage work is carried out synchronously, because the ward is a single room or a double room, the same needs to provide water supply and drainage, shower and other facilities.On this day, in order not to delay the construction period, the Third Bureau of China Construction and Wuhan municipal staff had a fight that was watched by the most people in history. The time is tight and the task is heavy. All construction units compete against each other, only for the hospital to put into use as soon as possible. In recent days, the high-intensity promotion, the workers are highly nervous, are all hot-blooded men, are using their lives to rush to work! Small misunderstandings don't affect the overall situation. It's a short time without delay. It's really a struggle.In particular, China Railway Heavy Industry Group Co., Ltd. received the construction assistance task at 2:00 a.m. on January 30. By 1:00 a.m. on January 31, in 23 hours, they completed the field assembly of 19 trusses in the medical technology building of huoshenshan hospital (a total of 23 trusses, 4 trusses completed by the previous unit), which means that all employees completed the welding work 24 hours a day.Lenovo donated 500 computers and 275 printers, and also sent them to huoshenshan hospital. Lenovo promised to donate all the IT equipment needed by huoshenshan and leishenshan hospitals, and also arranged volunteer engineers to ensure the operation of the information system.Day8: successful power transmission, bright nightJanuary 31st.The foundation works have been completed, huoshenshan has been electrified, and the foundation pit of sewage treatment plant has been completed! In the completion of civil engineering and decoration works, 70% of water supply and drainage and fire fighting system and 70% of ground buildings are completed, and visual inspection of ventilation and air conditioning, lighting monitoring and communication weak current works are basically completed.It is emphasized that the foundation pit is a large pit with a depth of 2000 square meters and 12 meters, and the deepest 4 meters is the rock layer, so it is very difficult to excavate. At the same time, because it is still in cross operation and the site is narrow, it is necessary to put 20 excavators (blue forgetting machine is in it) and 60 muck trucks for construction. How difficult do you say? The foundation pit has been dug for three days since January 29, and it was not completed until the evening of January 31.Praise the more than 200 construction personnel of State Grid Wuhan company. They work continuously for five days and five nights. At 12 o'clock in the evening, the huoshenshan hospital is fully electrified. The huoshenshan hospital lights up. Is the light far away?The State Grid has also set up a headquarters for epidemic prevention and electricity protection, which has been on guard for 24 hours, promising that "the virus will not be withdrawn and the State Grid will not be withdrawn". At the critical moment of this campaign, no matter the state-owned enterprises and private enterprises, they have responsibilities. They are all united in helping Wuhan. Apart from being moved, there is nothing to say.What is electricity protection? Every new year, due to the change of urban power consumption and rural power consumption, the State Grid and South Grid will carry out power conservation work, and add transformers and other equipment to the rural power grid to ensure that the power supply in the vast rural areas will not be interrupted. However, this power protection system is patrol inspection and repair reporting system, which will ensure that residents can restore power within a period of time, while squatting power protection means that there are always people on site to ensure that the power supply of huoshenshan hospital will not be interrupted.It can be seen that the ward area has been basically formed, concealed works and interior decoration have been started, lighting lamps have been installed, Gree air conditioning has started to enter the site to install air conditioning, and Midea water heater is also being installed.Day 9 main body forming and hoisting completedOn February 1, victory is in sight.It can be seen that the main body of the building is fully formed and the construction personnel are carrying out roof waterproof work.The largest and deepest foundation pit of huoshenshan hospital has also been excavated. The rainwater storage tank, 5 septic tanks, 2 contact disinfection tanks and PP modules of the core unit of water treatment have begun to be hoisted in large area, and the workload is not much left through visual inspection. The completion of sewage treatment on February 2 has been nailed on the board.So far, all the difficulties have been overcome!CITIC design, China Construction Third Engineering Bureau, Wuhan Construction Engineering Group, Wuhan Municipal Engineering Group, Hanyang Municipal Engineering Group, and China Railway Heavy Industry Co., Ltd!It's a great enterprise to give money and effort in the construction of huoshenshan hospital!It's great to have 3000 construction workers on two shifts in the day and night!Comfortable and clean wardThe novel coronavirus pneumonia confirmed in Wuhan was first officially diagnosed in February 4, 2020 at the Hon Shen Shan Hospital in 9.They are well treated and cared for in the hospital, and have a deep friendship with the medical staff.Novel coronavirus pneumonia was diagnosed and discharged by the first time in February 13, 2020 at 4 p.m., after 8 days of careful diagnosis and treatment by the medical staff of the God of fire. 7 patients with new crown pneumonia were discharged from hospital.Today, as a community of shared destiny, human beings should give up prejudice and fight against the virus together.Rather than questioning the efforts of staff and medical staff behind their backs. Sometimes, it's not the virus that does more harm to those who save lives, but the rumors.Thank you for reading.
What components do I need to buy to build a desktop computer from scratch?
Assuming the goal of this is to put together a DIY personal computer and not an attempt to fabricate from whole cloth a form of computing device here are the basics:1) CPU. The heart of the PC, this decision will help shape the rest of the system. You have to have one of these.2) CPU Cooler: CPUs get hot, you're going to need something to move that heat away from the chip, be it a passive heat sink, air cooler or water cooling system3) Motherboard (or system board.) Everything (including the CPU) connects to this. Different CPUs require different sockets on the system board, so once you have selected a CPU, this would be your next choice.4) RAM. Needs to be matched to the processor and the system board, comes in many sizes and speeds and specifications.5) Power Supply Unit (PSU.) As with everything else, comes in lots of shapes and sizes and specifications, but this is what powers everything in the computer. Needs to be rated to provide enough power for the sum of the components in the system.6) Secondary Storage. This can be a Hard Disk Drive, a Solid State Drive or even a USB stick (not generally useful for full time computing, but it does work.) In general, you pay less per unit of storage for a HDD than a SSD, but the SSD performs better.7) Case. Something to put it all in. It has to be large enough to fit all of the selected components above, but may need to be larger still to accommodate optional components.OPTIONAL (maybe.)8) Graphics card. This is optional (maybe) depending on your choice of CPU and System board. Many CPUs and motherboards have an option to utilize "onboard" graphics, but this option is not available on high end chips. In general, graphics cards provide better performance than onboard graphics.9) Sound card. You don't need one, and many system boards feature onboard sound. If your board doesn't feature onboard sound, or you want better sound than is available onboard, you can add an external sound card to the system.10) Optical Drive. Optical drives are starting to go the way of the floppy. Modern cases will often omit the optical bay and virtually any piece of software can be installed from other methods. That being said, optical drives are still useful for some applications and can add support for movie formats like Blu-Ray to a system.11) I/O devices: Monitor, Mouse, Keyboard. Not required for every computer, but useful for most applications of a computer and generally handy for the setup of computers that will be run without (called "headless.")Obviously, there's more that you can add, but at the core of the desktop PC for DIY builders, that's about it. PC building can be very approachable and very simple, even to the untrained. For first time DIYers, the best advice I can give is:Ask lots of questions, but understand the difference between questions that will get a factual answer and questions that will result in an opinion. ('Will this CPU fit in this motherboard' is a factual question and will get a definitive answer. 'Is this a good graphics card' will get a wide range of opinions that can be overwhelming.)Don't sweat all the brand loyalty based noise. There are lots of holy wars in the land of PC DIY (AMD vs Intel, AMD vs Nvidia, EVGA vs ASUS vs Gigabyte....) Look at each part and ask if it fits your needs and if that individual part is good. The history of a brand matters less than the quality of the specific part you need.Know what you're building the computer for. There are lots of different options and asking questions about "What is best" can get you into purchasing more expensive parts than you need. "Best" isn't as important as "Right for your use."Last thing for any new system builder: You can cut corners in lots of places, but there is one place you shouldn't ever cut corners and that's your PSU. This is the electrical foundation of the entire system and most computer failures that damage components originate from here. That doesn't mean every system needs a 1600 watt 80+ platinum PSU, but it does mean that you should look carefully at this component and make sure it will suit your needs. (Electrical fires are no joke, and letting the magic smoke out of your computer is a sure way to ruin your day.) Note: I just want to clarify after Jacob's comment. Jacob VanWagoner is absolutely correct that you don't need a high power PSU, but you need both enough power and you need reliable power. Bargain basement PSUs should really be avoided, buy from a reputable builder and err on the side of a higher rated PSU if in doubt. http://www.jonnyguru.com/ is one of the most reputed places on the net to get reviews for power supplies.Good luck and happy building!
What were the best tanks of the cold war era?
The M1 Abrams is a third-generation American main battle tank designed by Chrysler Defense (now General Dynamics Land Systems).[9] Conceived for modern armored ground warfare and now one of the heaviest tanks in service at nearly 68 short tons (almost 62 metric tons), it introduced several innovative features, including a multifuel turbine engine, sophisticated Chobham composite armor, a computer fire control system, separate ammunition storage in a blow-out compartment, and NBC protection for crew safety. Initial models of the M1 were armed with a licensed-produced 105 mm Royal Ordnance L7 gun, while later variants feature a licensed Rheinmetall 120 mm L/44.The M1 Abrams was developed from the failure of the MBT-70 project to replace the obsolescent M60 Patton. There are three main operational Abrams versions, the M1, M1A1, and M1A2, with each new iteration seeing improvements in armament, protection, and electronics. Efforts to develop an M1A3 version were first publicly disclosed in 2009.[10][needs update] Extensive improvements have been implemented to the latest M1A2C and D (formerly designated M1A2 System Enhancement Package version 3 or SEPv3 and M1A2 SEPv4, respectively) versions such as improved composite armor, better optics, digital systems and ammunition.[11] The Abrams was due to be replaced by the Future Combat Systems XM1202 but due its cancellation, the U.S. military has opted to continue maintaining and operating the M1 series for the foreseeable future by upgrading with improved optics, armor and firepower.The M1 Abrams entered service in 1980 and currently serves as the main battle tank of the United States Army and Marine Corps. The export version is used by the armies of Egypt, Kuwait, Saudi Arabia, Australia, and Iraq. The Abrams was first used in combat in the Persian Gulf War and has seen combat in both the War in Afghanistan and Iraq War under U.S. service, while Iraqi Abrams tanks have seen action in the war against ISIL and have seen use by Saudi Arabia during the Yemeni Civil War. Q3.24.20. SPSee Internet Search: M1 Abrams - Wikipedia
- Home >
- Catalog >
- Business >
- business plural >
- Unit 11 Optical Storage